Ongoing Projects



Abu Dhabi Plaza, Kazakhstan
Abu Dhabi Plaza Location: Abu Dhabi Plaza is a mixed-use development complex in the very center of Astana, the capital of Kazakhstan. The tallest tower of Abu Dhabi Plaza at 311 metres is the tallest building in Kazakhstan and Central Asia.

Commencement of Works: M/s Pamposh Started working at Project in the month of 19th July-2014.

Completion of Works: M/s Pamposh Completed given jobs in January-2021.

M/s Pamposh build 5 towers and retail podium over a basement car park.

Abu Dhabi Plaza BLOCK-R (Level-75 + 3 Level Crown)
Block -R Tower is 310 m- High and Including 75 storeys, It is the tallest Building in the Commonwealth of Independent states region, Lower Third Office and Upper two third Residential units. M/S PAMPOSH CONSTRUCTIONS Team started the work in block-R From Basements B02 There was Doka hydraulic climbing system on Main Core. Various internal slabs, 2 staircases, 2 Lift Core, 75 floors composite slabs and Columns and 3 Sets of Outrigger levels consisting of SAS bar Installation and heavily reinforced concrete wall, All Concrete works with a very high specification as required by the Concrete.

Abu Dhabi Plaza BLOCK-H (Level-14)
4 Star Hotel With 190 Bedrooms and 100 Serviced apartments, 4 stair case, 4 lift shaft, The construction was started in 2 part , (H1&H2), and Every part was done By Pamposh team, Mr. ( Vinay Srivastava 900060) First Day on side was start in this under construction Building at Basements B03 at Dated 19 july 2014, Under the K Swami and other supporting staff Mr Ram balak & Mr. Manas.

BLOCK-O (Level-29)
Business centre Tower, Class A+ Office Building, 2 stair case with 2 lift shoft, M/S PAMPOSH CONSTRUCTIONS team was Involved in construction of core wall, Inner Slabs, Composite slabs with Columns- Rebar, Shuttering, Concrete, screed, plasters, Tiels, Waterproof, pumps Foundations, and other Finishing works.

Abu Dhabi Plaza BLOCK-Y (Level-31)
A 31-storeys business centre office.

BLOCK-Z (Level-16)
The Residential Tower, PCIP team involved on Constructions Like Core, Composite slabs, Columns, Inner slabs, 3 stair case, 2 Lift Shaft, Plaster work, Different type of Concrete tiles and other Finishing Works.

Abu Dhabi Plaza PODIUM (B-4+L2)
The 4 Levels of Basement and 2 level Podium (Ground Retail), Basements is a car parking with space to park more than 4000 vehicles, with Including Mechanical, Electrical and Plumbing (MEP) Rooms , Pcip Team was involved for difference type of work Rebar, shutter, Concrete, Finishing Work Etc.

The plaza has been categorized into seven towers or blocks, including Tower-R, Tower-Y, Tower-O, a 29-level business centre; Block Z, a 16-level residential building; Tower H, a 14-level 4 Star hotel with 190 bedrooms and 100 serviced apartments and a two-level shopping mall.

Phases one and two of the project comprised Towers-Y,O,H and Block-Z Starwood Group operating the hotel tower under its Sheraton Brand.

UPTOWNTOWER
Project Specifications: The Main Contractor is
Belhasa Six Construction LLC.
Interiors International Industries LLC.

Pamposh is executing Tile Works in lobby, Hotel area & Residential Apartments. The size of tiles is varying from 25 x 25 mm to 1200 x 600 mm, Including Mosaic in Vanity, floor & Counter areas.Tiles from Italy/ France Supplied by M/s III, Glue & Grout is provided by Pamposh

Wall Tiles: -23250.3m2, Floor Tiles: -25884.8 m2, Skirting: -1741.5 Lm. Screed: - 6109.5 m2, Kerb: - 10197 No's

Start Date: - Dec-20
Project Status: - Ongoing

Dubai Creek Harbour Development Phase- 3
A new six-million square metre mega-city taking shape at The Lagoons near the Ras Al Khor wildlife sanctuary on Dubai Creek.

Project Specifications: Engineering Contracting Company LLC. is the main contractor. Pamposhexecuting RCC along with formwork, steel R/f and other relevant works of 10 Building varies from 8th to 12th floors

Start Date: - Dec-22
Project Status: - Ongoing

Dubai Waste Management Centre
It’s one of the world's largest waste-to-energy plants to be built in a single phase by M/s BESIX and Hitachi Zosen Inova.

Project Specifications: Belhasa Six Construction LLC. is the main contractor. Pamposh is executing Marble & Tiling work,
I. Marble: - Supply & Installation
II. Tiling: - Installation

Start Date: - Aug-22
Project Status: - Ongoing

Serenia Living, The Palm Jumeirah, Dubai, U.A.E
Project Specifications: Pamposh Scope of Works
The Peninsula Tower Residential Building at Plot B, Business Bay, Dubai, U.A.E
Project Specifications: Pamposh Scope of Works

Cuba Projects

Q24 (Hotel SOL_SON)
Q24 (Hotel SOL_SON) Project Details:
CORONA HOTEL
CORONA HOTEL It has 4 floors and 126 Rooms the Corona Project started in the year 2021 and Pamposh finishing team joined project from the month of April-2022.

The Corona is expected to finish by end of year 2023.


K-23
K-23 The project K23 Hotel construction will be the tallest hotel in Havana, and it is located in the central 23rd avenue, between K and L, in Vedado.

The K 23 Hotel building will have 42 floors and 565 rooms, the construction of project started in 2019 and finishing team of Pamposh joined the project in the year 2022.

The hotel intends to be five stars and should be finished by the begining of year 2024. It will be by far the highest in Havana, at 154 meters, higher than the 27-story Habana Libre, 70 meters high.

P 70 / GRAN MUTHU HABANA
P 70 / GRAN MUTHU HABANA It has spectacular sea views, it is set in a prime location in Havana.

The Gran Muthu Habana will have a buffet restaurant, which will be the first Indian restaurant of its kind in the city, which, together with other gastronomic spaces and the bars in the Lobby and pool, will offer a variety of culinary proposals.

P 70 Project started in of Year 2019 and is supposed to finish by end of year 2023, one part of the Hotel will be started soon by March-2023.

Tower-1 Tower-2
BARACUTEY - 61
BARACUTEY - 61 Location: In continuation of Construction of Hotels Chain, Baracutey-61 is a secon Hotel which has been constructed in Pinselinin Beach of Ramon de Antilla, Province Holguin, Cuba.

Commencement of Works: M/s Pamposh Started working at Project in the month of November-2021 with a small team of 32 workers which has been increased upto 137 workers till date.

Completion of Works: Under Construction.

Habitation: Hotel has capacity of 680 Rooms (includes Suite Rooms) in 8 ( A, B, C, D, E, F, G & H) blocks.

ROCA NORTE
Cayo Paredón Grande is the name of a Cuban island located in the Jardines del Rey. The island, like many others in Cuba, bases its main economic activities around tourism, taking advantage of its numerous white sand beaches.

ROCA NORTE ROCA NORTE 1 :
It has 638 Rooms with 04 Swimming Pools.
Start Date of Project: 7th October 2019
Handover Date: September-2023.



ROCA NORTE ROCA NORTE 2 :
It has 656 Rooms with 03 Swimming Pools.
Start Date of Project: 26th April 2021
Handover Date: End of 2025.



PLANTA MODULAR ( POLE RAN )
PLANTA MODULAR ( POLE RAN ) Planta Modular is situated / established on a hill which is around 35 Kms. far from Baracutey-61 project. Planta Modular has the facility of fabrication of individual Hotel Rooms which includes Structural work, MEP, Finishing and furnishing works in the plant itself. Ready Rooms are being shifted through a logistic facility to the upcoming project (Baracutey-61 A) and assembled. Since May-2023, our workers have been engaged in the finishing work (Carpenters, Tilers and Painters) at Planta Modular. Planta Modular is being established for keeping in view that future projects in Ramon de Antilla shall be constructed with the support of Planta Modular.

In this We have to Do the Production of 9000 Rooms.

HOTEL CHAPELIN TAÍNOS
BBI has started a new project named HOTEL CHAPELIN TAÍNOS in Varadero.

The project comprises of :
METROPOLIS
METROPOLIS Metropolis project is currently underway, which is located in Old Havana.
The hotel has a total of 10 floors and having 216 bedrooms.
Lobby, bar, restaurant, and gym Build at Level 1 to Level 3. A swimming pool is also on 9th floor.

This project was started on July 2019 and Target to finish in December 2023.

PIYB
PIYB P1YB is one of the biggest projects in Havana, which is currently under construction.

The project have a total of 32 floors, with gym, spa, bar and lobby and restaurants from level 1 to 4, and having total of 520 rooms from level 4 to level 32.

A swimming pool will also built on the 29th floor.
Project was started on June 2022 and tentative target to finish on July 2024.

Q-21(B) (Hotel COCO CARIBE)
Q-21(B) (Hotel COCO CARIBE) Project Details :
Hotel Oasis H 1 Varadero
Hotel Oasis H 1 Varadero The Hotel OASIS H-1 VARADERO* is with beautiful aerial views, this huge 531-room Hotel is 20 minutes from varadero Airport. It has 6 restaurant.2 bars, 2 swimming pools including buffet, It also offers a gym.

PAMPOSH finishing team has joined project in September-2022 Project Will be handed over to client in September-2023.


Pamposh Group of Companies Pamposh Group of Companies
Member IndiaMART.com
Pamposh Group of Companies Pamposh Group of Companies

Home About Us Services Recruiting Agent Projects Environment & Safety List of Works Testimonials Careers Company Video Contact Us Site Map
Member IndiaMART.com