Housing, Landscaping & Horticulture
Finishing & Hard Landscaping works at
JBR Beach
Pamposh executed paving & marble works for Beach
Front Retail and Entertainment Village at JBR Approximate quantity 17500
sqm. The paving installed in pathways in different patterns. The structure
is completely facing on the sea and is one of the prestigious project in
UAE.
This
project consists of a Five Star hotel and Seven Apartment Towers and Podium
complexes. Part of this project comprising of Raft Foundation of entire
complex, structural concrete works both horizontals and verticals, for four
towers and the entire podium connecting all the seven towers was allotted to
Pamposh by M/s Arabtec Constructions LLC.
Core Walls built with slip form are 300mm thick; Peri & Doka shuttering
for all verticals and horizontals up-to ground floor level and in Pent
houses. Repetitive Slabs were done in Table Form shuttering. The concrete
poured was 98000 Cum and the work was executed in a record time of 15 days.
Jumeriah
Beach Residence, a cluster of 52 towers of 35 -50 storey at Jumeriah Beach ,
Dubai (UAE), is a free hold residential accommodation. It is fitted with
ultra modern facilities/gadgets, with a common podium of five levels to
house various facilities viz. shopping complex, parking, swimming pool etc.
M/s Arabtech Constructions LLC, one of the principal contractors,
subcontracted the execution of structural concrete work of three towers and
erection of pre-cast cladding to Pamposh at fixed item Labour Rate basis.
Quantities executed are :
Reinforced concrete : 60000 Cum
Shuttering : 275000 m2
|
Reinforcement Steel : 10000 Tonnes
Precast wall Panels : 4500 units of size 8 - 14 m2
|
Extensive
use of mechanized construction techniques, slip form and Aluma table
shuttering were in practice to overcome the logistic difficulties due to
constraints in working areas and was completed in record time schedule of 18
months.
Principal Contractor M/s Arabtech Constructions LLC, Dubai, UAE.
Bouygues Batiment International, France had
sub-contracted the work for development of VRD area comprising of 30,000m²
area all around and on sides of Arts and Congress Centre to "Pamposh".
Following were the jobs undertaken:-
- Surveying and Dividing of the whole area into rectangular Blocks
of various sizes with pathways marked in-between the rectangular
patches.
- Compacting of sub-grade and laying of concrete base for marble
setting. Laying of cobblestones in concentric circular patterns with
gaps between each cobblestone filled with cement mortar.
- Laying and developing of horticultural patches in VRD area as per
the design pattern.
- Finishing of stairways all around the building with granite
marble stairs, treads and decorative nosing carved out of marble
treads at its edges.
- Laying of the piping system and structure for fountains and other
water bodies, finished with Granite.
|
This project, executed for Enterprise Jean Amiouny of
Paris, involved construction of 504 Pre-fabricated housing units spread over
in 42 blocks, each one a 3-storied construction, at Iskandria Iraq. The main
housing units were built of Pre-Fabricated concrete elements with embedments
for electricity, cutouts for doors and windows etc. The foundations of the
buildings were of raft type with cast in-situ reinforced concrete. The roofs
of housing units were given special treatment comprising of one layer of tar
felt over which a mixture of earth and sand was compacted in thickness of 10
cms.- 20 cms in slopes in various directions. This formed a cushion base for
cast-in-situ concrete tiles with trowel finish being given to the joints
filled up with Mastic. The floor area of the buildings constructed is
approximately 55,000m2.
Pamposh rendered its services to "Enterprise Jean
Amiouny of Paris" for following jobs.
1. Providing and managing skilled Human Resource including workers and
staff for their factory at Iskandria, for production of Pre-fabricated
concrete elements
2. Undertaking the job of erection of 504 pre-fabricated housing units
directly under our supervision with the employment of 300 men managed,
maintained and supervised by "Pamposh".
The work involved preparation and laying of 42000m2
of tiles with joints grouted on a base layer of sand. The base layer had to
be prepared by removing the Tar Macadom road of Abu Niwas, Sadon Street and
Tahrir Square.
The project was executed by "Pamposh" on behalf of Ansal
Properties & Industries (P) Ltd, as their Sub - Contractors, for Amanat
-Al-Assima, Baghdad (Iraq).
Villas
Pamposh
has built many private villas in the posh localities of New Delhi and NCR,
India
M/s Arabtec the principal contractor, awarded the Tiling
work of Infinity Tower Marina Dubai, an eighty stories building, to Pamposh
on a Firm Item Rate basis, wherein the tiles were provided by the client
itself.
A high precision finishing job involved approximately 25,000 sqm. of Tiles
and 8,000 mtr. skirting in designs and patterns was executed by Pamposh in
nine months.
Mirdif Hills North Village
Engineering Contracting Co. LLC is the main contractor. Pamposh has bagged finishing works along with the structure.
Mirdif Hills is a mixed-use residential, commercial and retail development in Dubai, spread across 4 million square feet of land.
The project comprises over 1,250 apartments - a mix of studio, one, two, three, four-bedroom apartments and duplex units, hotel, commercial options, retail outlets and community recreation spread across four clusters - Al Multaqa Avenue, Janayen Avenue, Nasayem Avenue and South Avenue
Project Quantities executed by M/s Pamposh for Tile Work upto Dec 2018:
Floor Tile - 10022.04 Sqm, Wall Tile - 4200.00 Sqm, Skirting - 6731.00 LM
BAHWAN TOWER
Name of the Project : BAHWAN TOWER
Main - Contractor : ANC Contracting LLC
Project Type : Residential Towers
The Project comprisesof one, two, three and four Bedroom apartments, covered parking, GYP, Swimming Pool and Play Area. It has Ground Floor - 01, Mezzanine / Podium - 03, Typical Floor - 15 and Roof having total 132 nos. apartments.
Project Quantities executed by M/s Pamposh for Tile Works :
Floor Tile - 2486.10Sqm, Wall Tile - 2230.10Sqm, Skirting - 2199.75L.Mtrs.
ATRIA TOWER
Name of the Project : ATRIA TOWER
Main - Contractor : Al Rostamani Pegel LLC
Project Type : Residential and Service Towers
Elegantly designed Studio, 1, 2, 3 bedroom & 3 bedroom units having 25th level - Infinity Pool, 5-star Spa, Gymnasium, Visitor Parking Spaces, Dedicated Retail Area of about 11,000 sq. ft, 9 Retail Shops. In addition to that it has similar area of charming landscaped terrace.
Project Quantities executed by M/s Pamposh for Tile Works :
Floor Tile - 11506.36Sqm, Wall Tile - 7426.49Sqm, Skirting - 12547.20 L.Mtrs.
Boulevard Crescent - Down Town Dubai
Name of the Project : Boulevard Crescent - Down Town Dubai
Main - Contractor : Al Rostamani Pegel LLC
Project Type : BLVD CRESCENT LUXURY RESIDENTIAL TOWERS
BOULEVARD CRESCENT FEATURES LUXURY APARTMENTS IN TWO TOWERS OF 43 AND 21 STOREYS (Total 307 Apartments), Connected by a podium, an infinity pool and a gym. The project is comprises of 1bhk, 2bhk, 3bhk and studio apartments.
Project Quantities executed by M/s Pamposh for Tile Work :
Floor Tile - 11,313.87 Sqm, Wall Tile - 2803.57 Sqm, Skirting - 5745.15 L.Mtrs.
Aykon City Tower-B
Aykon City is a multi-Storey Residential complex under Development in Sheikh Zayed Road, Dubai. (UAE)
Building Specifications:
- Each building will comprise a mix of studios, one-, two- and three-bedroom apartments.
- On the roof top the 'Aykon Dare' tourist attraction will allow guests to enjoy the views of the city by walking around the outside of the tower's roof on the 80th floor.
- The 324-key DamacMaison de Ville Hotel will occupy the top 10 floors with the lower floors containing 964 furnished hotel apartments ranging in size from one to three bedrooms. The hotel apartments will be managed by DAMAC Maison Hotels and Resorts.
China State Construction Engineering Corp, LLC is the main contractor. Pamposhexecuted Tiling works
Floor Tiles: - 20282m
2, Wall Tiles: - 497m
2, Screed: - 20293m
2, Skirting: - 11370 Lm, Threshold: - 246 No's
Start Date: - Oct-19.
Completed on: - Jan-21.
Dubai Creek Harbour Development Phase - 2
A new six-million square metre mega-city taking shape at The Lagoons near the Ras Al Khor wildlife sanctuary on Dubai Creek.
Building Specifications:
- Dubai Creek Residences, a six tower apartment complex which should offer great views of Dubai Creek and the Dubai skyline.
- Dubai Creek Harbour has approximately 100 million sqft of future development
Engineering Contracting Company LLC. is the main contractor. Pamposh is executingTiling works.
Start Date: - jun-21
Project Status: -Completed on Dec-21.
Forte (Plots D1- D2), Downtown Dubai Development
Forte is a multi-storey Residential complex under development in Downtown Dubai.
Project Specifications:
- A 71-storey twin-tower development in the Opera District in Downtown Dubai.
- The buildings contain Tower 1 is five basement floors +G+72 typical floors. Total built up area of 93,119 m2. Tower 2 is five basement floors + G+ 43 typical floors. Total built up area of 45,664 m2.
Target Engineering Construction Co. LLC is the main contractor. Pamposh has been executed the following quantities:
RCC: - 59536.3 Cum
Start Date: - July-18
Project Status: - Completed on Jan 2021